Technical Analysis for KNF - Knife River Holding Co.
Grade | Last Price | % Change | Price Change |
---|---|---|---|
A | 96.41 | 0.69% | 0.66 |
KNF closed up 0.69 percent on Tuesday, October 29, 2024, on 76 percent of normal volume. The bulls were able to push the stock to a new 52-week high. Due to the stock's strong uptrend, it may remain overbought for a while. So, if you're looking for a reason to sell, don't put too much weight on it being overbought.
ADX | Long Term | Intermediate Term | Short Term |
---|---|---|---|
Strong | Up | Up | Up |
Date | Alert Name | Type | % Chg |
---|---|---|---|
MACD Bullish Signal Line Cross | Bullish | 0.00% | |
New 52 Week Closing High | Bullish | 0.00% | |
Slingshot Bullish | Bullish Swing Setup | 0.00% | |
New 52 Week High | Strength | 0.00% | |
Outside Day | Range Expansion | 0.00% | |
Overbought Stochastic | Strength | 0.00% | |
Up 3 Days in a Row | Strength | 0.00% | |
Up 4 Days in a Row | Strength | 0.00% | |
Gapped Down | Weakness | 0.00% | |
New 52 Week Closing High | Bullish | 0.69% |
Alert | Time |
---|---|
10 DMA Support | about 9 hours ago |
Fell Below Previous Day's Low | about 9 hours ago |
Down 2 % | about 9 hours ago |
Down 1% | about 9 hours ago |
Up 2% | 1 day ago |
Get a Trading Assistant
Let us help you stay on top of your investments. We will alert you to important technical developments on your
portfolio & watchlist.
Configure default chart indicators
Basic chart:
- Earnings date: 02/28/2024
Knife River Corporation provides aggregates-based construction materials and contracting services in the United States. It operates through six segments: Pacific, Northwest, Mountain, North Central, South, and Energy Services. It mines, processes, and sells construction aggregates, including crushed stone and sand, and gravel; and produces and sells asphalt and ready-mix concrete, as well as provides contracting services to support the aggregate-based product lines, including heavy-civil construction, asphalt and concrete paving, and site development and grading. It serves various projects related to highways, airports, and other public infrastructure. The company was founded in 1917 and is based in Bismarck, North Dakota.
Sector: Basic Materials
Industry: Building Materials
Keywords: Construction Building Materials Concrete Contracting Services Pavements Asphalt Crushed Stone Public Infrastructure Construction Aggregate Stone
Classification
Sector: Basic Materials
Industry: Building Materials
Keywords: Construction Building Materials Concrete Contracting Services Pavements Asphalt Crushed Stone Public Infrastructure Construction Aggregate Stone
Indicator | Bull Case | Neutral / Hold | Bear Case |
---|---|---|---|
50 DMA | |||
200 DMA | |||
ADX Trend | |||
Oversold / Overbought | |||
Relative Strength |
Indicator | Value |
---|---|
52 Week High | 96.44 |
52 Week Low | 49.6 |
Average Volume | 320,472 |
200-Day Moving Average | 76.64 |
50-Day Moving Average | 85.83 |
20-Day Moving Average | 91.38 |
10-Day Moving Average | 93.82 |
Average True Range | 2.36 |
RSI (14) | 69.14 |
ADX | 34.82 |
+DI | 33.92 |
-DI | 15.73 |
Chandelier Exit (Long, 3 ATRs) | 89.37 |
Chandelier Exit (Short, 3 ATRs) | 92.86 |
Upper Bollinger Bands | 96.90 |
Lower Bollinger Band | 85.85 |
Percent B (%b) | 0.96 |
BandWidth | 12.09 |
MACD Line | 2.49 |
MACD Signal Line | 2.40 |
MACD Histogram | 0.0903 |
Pivot Point Level | Traditional / Classic | Fibonacci | Demark | Woodie | Camarilla |
---|---|---|---|---|---|
Resistance 4 (R4) | 100.60 | ||||
Resistance 3 (R3) | 100.14 | 98.29 | 99.90 | ||
Resistance 2 (R2) | 98.29 | 97.22 | 98.52 | 99.66 | |
Resistance 1 (R1) | 97.35 | 96.57 | 97.82 | 97.81 | 99.43 |
Pivot Point | 95.50 | 95.50 | 95.74 | 95.73 | 95.50 |
Support 1 (S1) | 94.56 | 94.43 | 95.03 | 95.02 | 93.39 |
Support 2 (S2) | 92.71 | 93.78 | 92.94 | 93.16 | |
Support 3 (S3) | 91.77 | 92.71 | 92.92 | ||
Support 4 (S4) | 92.23 |