Colíder Dam Stocks List
Symbol | Grade | Name | % Change | |
---|---|---|---|---|
ELPC | F | Companhia Paranaense de Energia (COPEL) | -3.26 | |
ELP | F | Companhia Paranaense de Energia (COPEL) | -3.31 |
Related Industries: Utilities - Diversified
Symbol | Grade | Name | Weight | |
---|---|---|---|---|
BRAZ | F | Global X Brazil Active ETF | 1.94 | |
SMOG | D | VanEck Vectors Low Carbon Energy ETF | 0.41 | |
NSI | D | National Security Emerging Markets Index ETF | 0.1 | |
AVSE | D | Avantis Responsible Emerging Markets Equity ETF | 0.04 | |
APIE | D | Trust for Professional Managers ActivePassive International Equity ETF | 0.02 |
Compare ETFs
- Colíder Dam
The Colíder Dam is a rock-fill dam with an asphalt-concrete core, built from 2011 to 2019 on the Teles Pires river. It is located about 40 km (25 mi) southeast of Colíder in the state of Mato Grosso, Brazil. The dam's hydroelectric power stations have 3 turbines each 102.3 MW, resulting in a total installed capacity of 306.9 MW. Construction on the run-of-the-river type station was initiated in May 2011, and the last unit started operating in December 2019.The dam is part of a planned six power plant "Hidrovia Tapajos/Teles Pires" project to create a navigable waterway connecting the interior of Brazil to the Atlantic Ocean.
The waterway will consist of five dams on the Teles Pires river: 53 megawatts (71,000 hp) Magessi Dam, 402 megawatts (539,000 hp) Sinop Dam, 300 megawatts (400,000 hp) Colíder Dam, 1,820 megawatts (2,440,000 hp) Teles Pires Dam, 736 megawatts (987,000 hp) Sao Manoel Dam) and the 230 megawatts (310,000 hp) Foz do Apiacas Dam on the Apiacas river.
The Colíder Dam, Sinop Dam and Teles Pires Dam are built, while the smaller upstream dams are still in the planning stages by 2019.
Popular Now
Recent Comments
- TraderMike on BOOT
- Dr_Duru on BOOT
- TraderMike on Stochastic Reached Oversold
- SuccessfulGrasshopper897 on Stochastic Reached Oversold
- Cos3 on Adding float as advanced filter criteria?
From the Blog
Featured Articles